Before a sewer, water, or road improvement project begins, a series of steps from conception to completion of plans is followed by the Engineering Department. Critical steps in this process provide for citizen input and analysis of the project's impact on the physical environment in Woodbury. The department also provides financial management for these improvements. If any of these projects are to be implemented through assessments, the records for the various improvements by the city are maintained by this department.
The department is charged with the responsibility of representing Woodbury interests with other agencies such as Washington County and the Minnesota Department of Transportation when those agencies implement any similar improvements within the city limits.
-
Bicycle and Pedestrian Plan
The City of Woodbury is seeking input on issues related to walking and biking within the city.
-
Future Road Projects
The city’s five-year Capital Improvement Plan identifies upcoming major roadway construction projects.
-
I-94 Repavement (Minnesota Department of Transportation)
A large pavement project on I-94 between Highway 120/Century Avenue and the St. Croix River began in July 2022 and is anticipated to be complete in 2024.
-
Lake Road Improvements
Sections of Lake Road are being converted from four to three lanes in the summer of 2023.
-
METRO Gold Line (Metro Transit)
The Metro Gold Line is a planned 10-mile dedicated bus rapid transit line that will connect St. Paul, Maplewood, Landfall, Oakdale and Woodbury.
-
Pavement Rejuvenation
Each year, the city completes a pavement rejuvenator project in designated areas to extend pavement life.
-
Roadway Rehabilitation 2023
A utility replacement and roadway rehabilitation project will take place in the Royal Oaks neighborhood in 2023 and 2024.
-
Roadway Rehabilitation 2024
A roadway rehabilitation project is planned for the Salem Meadows, Erin Court and Orchard Ridge neighborhoods in 2024.
-
Trail Improvements
Annual trail improvements expand the existing trail network coverage and connectivity within the city's multi-use system.
-
Colby Lake Drive
An Xcel Energy project will require a road closure on Colby Lake Drive in the spring of 2023.
-
Cottage Grove Drive Rehabilitation Project
Cottage Grove Drive, south of Dale Road, will receive pavement rehabilitation in 2024.