Roadway Rehabilitation 2021

The project areas include the Preserve Area and Hudson Road as shown on the Project Map (PDF). The developments in the Preserve Area were built in the mid to late 1990s, and the pavement has deteriorated to a point where maintenance is no longer effective. The total length of roads in the area is approximately 4.5 miles. The rehabilitation project will include:

  • Pavement resurfacing
  • Replacement of damaged curb
  • Combination of full and spot curb replacement
  • Minor repairs to storm sewer, sanitary sewer, and watermain

Sign up for InTouch Email Notifications

Sign up to for InTouch to receive project updates. Be sure to select the "Roadway Rehabilitation 2021" list.

April 29 Preconstruction Meeting Recording

View the presentation (PDF).