During the summer of 2021, roadway rehabilitation took place in the Preserve and Hudson Road areas (as shown on the Project Map (PDF)). The developments in the Preserve Area were built in the mid to late 1990s, and the pavement had deteriorated to a point where maintenance was no longer effective. The total length of roads in the area is approximately 4.5 miles, and the rehabilitation project included:

  • Pavement resurfacing
  • Replacement of damaged curb
  • Combination of full and spot curb replacement
  • Minor repairs to storm sewer, sanitary sewer, and watermain