Pavement Rejuvenation

RejuvenatorEach year, the city completes a pavement rejuvenator project (formerly known as reclamite) in designated areas to extend pavement life and contain materials within the original asphalt pavement. The rejuvenator is an oil-based material that will be sprayed directly on the road surface, followed by the temporary application of a sand product. Construction is projected to begin on July 26th and is expected to span 4-5 days. Scheduling may be adjusted due to weather conditions.

View 2023 Pavement Rejuvenator Project Map (PDF)